Nov 18, 2008
The Classes Pitch In
Footing prepped for the beam supports.
Category:Lesotho 2008/09
Posted by: Ann
The footing was additionally prepped for the steel beams that will be erected in early December. The footing was leveled to within 2 cm and gravel was added all around. An entire classroom helped with this last step and it was done in 40 minutes. Yes, we'll be doing a little QC first thing in the morning. :)